Artwill, Interior Design House
Hong Kong Island 2018 Interior Design & Build

Mei Foo Sun Chuen

Mei Foo Sun Chuen is an interior design project completed by Artwill Interior Design House in 2018, located in Hong Kong Island, a 1,493 sq. ft. unit handled by Regina Kwok and the design team across Interior Design & Build.

Designed by Regina Kwok and the Artwill team

Mei Foo Sun Chuen

A 1,493-square-foot flat at Mei Foo Sun Chuen in Lai Chi Kok, Kowloon, an interior design and build that turns the home's awkward spots into the features the owners entertain around.

Every flat has its flaws, and the question we kept asking here was simple: how do you turn a weakness into a strength? The owners love to host, so instead of hiding the problems we leaned into them. The television sits in an unusual spot in front of the window, which keeps the neighbours from looking straight in, and a sliding partition closes across so the living room can become a private home cinema when they want one. To make that work, the whole sound system is built in, cables tucked out of sight and the gear chosen to match the timber on the walls.

The clearest example came in the kitchen. To open it up, we took down a wall, and partway through found a structural pillar inside it that simply had to stay. Rather than work around it apologetically, we used it: the pillar now extends to carry the marble dining table, so the table floats without legs and the awkward column becomes the reason the room works.

The timber walls, the built-in audio, and the dining table were all custom-made for the flat by our trusted partner factory, since this kind of problem-solving only holds together when every piece is made to measure. It is practical, resourceful residential interior design: a Mei Foo home where the constraints quietly became the best parts.

How do you turn a weakness into a strength?

Project Photography

Inside the project

Press

This project in the press

Mei Foo Sun Chuen, common questions

Where is Mei Foo Sun Chuen located and which district?
The project is located in the Hong Kong district shown in the sidebar above. Artwill has completed 500+ projects across all 18 Hong Kong districts since 2004.
How long did Mei Foo Sun Chuen take to complete?
A typical Artwill residential project runs 4 to 9 months from first site survey to handover: 6 to 12 weeks design, 12 to 24 weeks build, 2 to 4 weeks snagging. Actual timeline depends on whether structural alterations are involved.
How large is the unit at Mei Foo Sun Chuen?
Please see the floor area shown in the project sidebar above. Artwill's case library spans 400 sqft compact apartments to 4,000+ sqft duplex residences.
What is the budget range for a project like Mei Foo Sun Chuen?
Artwill residential pricing depends on unit size, finish level, and joinery scope. Actual pricing is confirmed after the measured survey and design development stage. Fees on enquiry.
ADDRESS 19/F., 103 Hennessy Road, Wan Chai, Hong Kong
OPENING HOURS
Monday 10:00 AM to 7:00 PM
Tuesday 10:00 AM to 7:00 PM
Wednesday 10:00 AM to 7:00 PM
Thursday 10:00 AM to 7:00 PM
Friday 10:00 AM to 7:00 PM
Saturday Closed
Sunday Closed
INSTAGRAM FACEBOOK YOUTUBE 小紅書
Artwill WeChat QR code

Open WeChat, Discover, Scan

Or save the QR and import it from your gallery.

Get a Free Quote