Artwill, Interior Design House
Hong Kong Island 2019 Interior Design & Build

Larvotto

Larvotto is an interior design project completed by Artwill Interior Design House in 2019, located in Hong Kong Island, a 1,862 sq. ft. unit handled by Regina Kwok and the design team across Interior Design & Build.

Designed by Regina Kwok and the Artwill team

Larvotto

A 1,862-square-foot flat at Larvotto in Ap Lei Chau on Hong Kong Island, an interior design and build that borrows the couple's love of travel and the harbour outside to carry the rooms from southern Hong Kong to southern Spain.

The owners love to travel, and the view from the flat looks straight onto the harbour, so we took both as the brief and threaded warm, sunlit colour through the rooms as accents. The aim was a small daily holiday: step inside, and the south side of Hong Kong Island starts to feel like the south of Spain.

The strongest moments are in the tiling. In the master bathroom a patterned feature wall sits opposite the basin, with the same tiling glimpsed again in the mirror and a panel of coloured grid glass alongside, so the whole composition reads richer than any single surface. Out by the breakfast nook and kitchen we switched to calmer blue and earth-toned tiles that pick up the green hillside just outside the window, tying the indoors to the landscape.

An open layout lets the spaces flow, and folding glass doors off the kitchen and master bedroom open onto an outdoor patio, so the family's beloved dogs have room to run between inside and out. The joinery was custom-made for the flat by our trusted partner factory. It is residential interior design with a sense of somewhere else: a bright, well-travelled home on the south side that knows exactly where it is looking.

Step inside, and the south side of Hong Kong Island starts to feel like the south of Spain.

Project Photography

Inside the project

Larvotto, common questions

Where is Larvotto located and which district?
The project is located in the Hong Kong district shown in the sidebar above. Artwill has completed 500+ projects across all 18 Hong Kong districts since 2004.
How long did Larvotto take to complete?
A typical Artwill residential project runs 4 to 9 months from first site survey to handover: 6 to 12 weeks design, 12 to 24 weeks build, 2 to 4 weeks snagging. Actual timeline depends on whether structural alterations are involved.
How large is the unit at Larvotto?
Please see the floor area shown in the project sidebar above. Artwill's case library spans 400 sqft compact apartments to 4,000+ sqft duplex residences.
What is the budget range for a project like Larvotto?
Artwill residential pricing depends on unit size, finish level, and joinery scope. Actual pricing is confirmed after the measured survey and design development stage. Fees on enquiry.
ADDRESS 19/F., 103 Hennessy Road, Wan Chai, Hong Kong
OPENING HOURS
Monday 10:00 AM to 7:00 PM
Tuesday 10:00 AM to 7:00 PM
Wednesday 10:00 AM to 7:00 PM
Thursday 10:00 AM to 7:00 PM
Friday 10:00 AM to 7:00 PM
Saturday Closed
Sunday Closed
INSTAGRAM FACEBOOK YOUTUBE 小紅書
Artwill WeChat QR code

Open WeChat, Discover, Scan

Or save the QR and import it from your gallery.

Get a Free Quote