Artwill, Interior Design House
Hong Kong Island 2014 Interior Design & Build

Baguio Villa

Baguio Villa is an interior design project completed by Artwill Interior Design House in 2014, located in Hong Kong Island, a 1020 sq. ft. unit handled by Regina Kwok and the design team across Interior Design & Build.

Designed by Regina Kwok and the Artwill team

Baguio Villa

A 1,020-square-foot home at Baguio Villa in Pok Fu Lam on Hong Kong Island, reworked for an empty-nester couple in a 35-year-old block.

The original plan had more rooms but smaller ones, the kind of layout that suits a young family, and it left corridors that wasted space. With the grown children no longer at home, we reset the flat: the tightly partitioned three bedrooms became one bedroom plus a study. That freed enough room to more than double the master bathroom, from 32 to 76 square feet, and the extra space let us turn the bathtub to face the windows and the view over Telegraph Bay.

The old kitchen had been tucked into a corner, closed off and built only for getting meals done, which no longer suited a couple on their own. We moved it into the middle of the living space and opened it up, so cooking became something to enjoy and to share with friends rather than a chore in a stuffy room.

Baguio Villa was built thirty-five years ago and many of the finishes were showing it, so this interior design leans forward in time. We made bold use of glass and steel, with geometric touches like the exposed circular speakers on the master bedroom wall and a collage of recessed rectangular shelves on the living room wall. Sliding doors and a near-total absence of handles, except on the front door and the shower, give the flat a clean efficiency, and the rounded forms of the Jacobsen Egg chair and the Eames DSR dining chairs echo the circular light fittings to leave the living area feeling almost futuristic.

Cooking became something to enjoy and to share with friends rather than a chore in a stuffy room.

Project Photography

Inside the project

Baguio Villa, common questions

Where is Baguio Villa located and which district?
The project is located in the Hong Kong district shown in the sidebar above. Artwill has completed 500+ projects across all 18 Hong Kong districts since 2004.
How long did Baguio Villa take to complete?
A typical Artwill residential project runs 4 to 9 months from first site survey to handover: 6 to 12 weeks design, 12 to 24 weeks build, 2 to 4 weeks snagging. Actual timeline depends on whether structural alterations are involved.
How large is the unit at Baguio Villa?
Please see the floor area shown in the project sidebar above. Artwill's case library spans 400 sqft compact apartments to 4,000+ sqft duplex residences.
What is the budget range for a project like Baguio Villa?
Artwill residential pricing depends on unit size, finish level, and joinery scope. Actual pricing is confirmed after the measured survey and design development stage. Fees on enquiry.
ADDRESS 19/F., 103 Hennessy Road, Wan Chai, Hong Kong
OPENING HOURS
Monday 10:00 AM to 7:00 PM
Tuesday 10:00 AM to 7:00 PM
Wednesday 10:00 AM to 7:00 PM
Thursday 10:00 AM to 7:00 PM
Friday 10:00 AM to 7:00 PM
Saturday Closed
Sunday Closed
INSTAGRAM FACEBOOK YOUTUBE 小紅書
Artwill WeChat QR code

Open WeChat, Discover, Scan

Or save the QR and import it from your gallery.

Get a Free Quote