Search for a whole-flat renovation package in Hong Kong and you will find dozens: a rate per square foot or per flat type, a list of what is included, and a promise that the budget is settled before work starts. For some flats that promise holds. For others the final bill drifts well past the package, not because anyone lied, but because the package was priced on a flat that is not quite yours. This guide explains how packages work, using seven Hong Kong contractors' package pages that we read in October 2026 (we do not name them, and we quote no prices). It covers what packages usually include and where they set limits, what they leave out, where the extras come from once work starts, which flats suit a package and which suit a designed job, how to compare a package quote with a designed quote, and what the Trade Descriptions Ordinance and the Consumer Council say about advertised packages.
The short answers first
- What is a renovation package? A fixed rate, by floor area or by flat type, for a set list of work. The rate is built on assumptions: a flat of a certain size and condition, the layout unchanged, standard materials, set quantities. It stays fixed only while your flat matches them.
- Who does a package suit? Usually a newer flat, a standard brief and a layout you are keeping. Some basic packages are offered only for newly completed bare-shell flats.
- What should I ask first? Three things. What is the quantity behind each item (how many electrical points, how many feet of cabinet)? Which materials am I expected to buy myself? What happens to the price if the site visit, or the work, finds something the package did not assume?
- Package or design and build? A package prices a standard flat; a designed job prices yours. If you are changing the layout, adding a lot of built-in joinery or renovating an older flat, a tailored quotation is usually the steadier route, as our renovation cost guide also says.
What a renovation package is

What packages usually include, and where they set limits
- Electrical. Capped by the number of points. One basic package sets the count by household size; another includes a fixed number of points plus a new consumer unit; a third says "designated points" with no number.
- Cabinets and joinery. Capped by linear feet. A five-foot kitchen wall cabinet appears on four pages; others give a set length of base cabinet, a short bathroom mirror cabinet, or furniture sized by household. One page says cabinets made longer or deeper are charged by the foot.
- Partitions. Usually one new room, in brick or board, sometimes with a stated maximum wall length.
- Plumbing. Only one package re-pipes the whole flat in concealed pipes. The rest move the sink and washing-machine drain, or install new taps, and leave the pipes as they are.
- Tiling and flooring. Two pages tile the kitchen and bathroom walls and floors. For the living room, three pages say the floor price covers the base work but not the tiles.
- Painting. On every page, often with a named paint. The basic packages paint the walls only; the ceiling is excluded.
- Ceilings. An aluminium false ceiling in the kitchen and bathroom, with two LED lights, on three pages.
- Doors and windows. One door in the basic packages, two or three in the design tiers. Only one package replaces the windows.
- Design. Four pages offer drawings, from free design to 3D renderings after signing.
- Rubbish and cleaning. Usually one clearance at the end of the job; one page clears rubbish throughout and includes a basic clean.
- Warranty and insurance. One year on workmanship and third-party and labour insurance appear on three pages each.

What packages usually leave out, or price as extra
- Materials you buy yourself. Three pages say the floor price excludes the tiles; one lists tiles, doors, door locks, lights and sanitary ware as items the client buys. Another adds that the quantity, wastage and delivery timing of client-bought materials are the client's responsibility.
- Work outside the package. One page lists demolition, moving water or electrical points, built-in furniture, false ceilings, aluminium windows, air-conditioning and glass partitions as separate items that can be added to the same quotation.
- The building's own costs. No page includes handling the management office's renovation application or its deposit. One lists the building deposit, the rubbish disposal fee and set working hours as costs or arrangements outside the package.
- Things found on site. One page is unusually frank: a ceiling that is peeling badly or has leaked must be scraped back before painting, as a separate item; warped or swollen doors are extra; a floor that is lifting, blackened or sounds hollow should be replaced rather than covered; ageing angle valves are a small plumbing extra; and in an old flat, leaks or aged pipes found once a wall is opened have to be fixed at the source first.
- Upgrades. Some pages offer upgrades, better taps, wood-look tiles, a different door handle, without saying what they cost.
- The site visit. One firm charges a measurement fee, refunded once the work is confirmed.
- The warranty. One page notes that its warranty covers workmanship, not normal wear or materials the client bought.
- The catch-all. "Other items cannot all be listed."
Where the extras appear once work starts

Package or design and build: which suits which flat
- the flat is new or recently completed, and its pipes and wiring do not need replacing;
- you are keeping the layout, or adding at most one simple partition;
- your brief is standard: tiling, flooring, painting, a kitchen and a few wardrobes in the package sizes;
- you are happy to choose from the package's materials, or to buy the tiles, lights and fittings yourself.
- the flat is older, and the pipes, wiring, walls or windows are likely to need work;
- you are changing the layout: opening the kitchen, moving a bathroom, removing or adding walls;
- you want a lot of built-in joinery, sized to the room rather than to a package length;
- the flat has rules of its own, as a Home Ownership Scheme flat does;
- the household has needs a standard plan does not meet, such as an elderly parent, small children or working from home.

How to compare a package quote with a designed quote
- List the same items. Write down every trade in the designed quote and find the matching line in the package. Anything the package does not list is an extra until the contractor says otherwise in writing.
- Compare quantities, not names. Number of electrical points, linear feet of cabinet, square feet of tiling, number of doors, number of coats of paint. "Kitchen cabinets" in one quote and "five-foot wall cabinet" in another are not the same item.
- Check who supplies what. Supply and install, or install only? If you buy the tiles, sanitary ware and lights, add their cost, the wastage and your time.
- Check brands and grades. Paint, tiles, worktop, hinges and taps, by name.
- Ask what triggers a variation. Which site conditions, found later, would change the price, and how each change is priced and approved before the work is done.
- Compare the payment stages. Each payment should follow a stage of work you can see. The Consumer Council's advice is to keep the first payment to no more than 40%.
- Compare the warranty. How long, and what it excludes.
- Check the building items. Who applies to the management office, who pays the deposit, and who clears the rubbish, and how often.

Advertised packages and the law
- False trade descriptions of services (s.7A). A trade description is any indication, direct or indirect, about the service, and the guidelines list the price and how the price is calculated among the aspects covered.
- Misleading omissions (s.13E). Omitting or hiding material information, or giving it in a way that is unclear, unintelligible, ambiguous or untimely, so that the average consumer is likely to make a decision they would not have made otherwise.
- Bait advertising (s.13G). Advertising at a specified price without reasonable grounds to believe the trader can supply at that price, in reasonable quantities, for a reasonable period. The guidelines say a disclaimer such as "while stocks last" is unlikely to be sufficient.
- Bait and switch (s.13H). Inviting purchase at a specified price and then trying to sell something different, for example by refusing to show the advertised item or showing a defective sample.
How we handle it
Further reading
- Hong Kong Renovation Cost: The 7 Factors That Move the Price
- How to Read a Renovation Quotation, Line by Line
- Full Renovation or Partial Renovation? A Decision Guide for Hong Kong Homeowners
- Renovating a 40-Year-Old Flat: Pipes, Spalling Concrete, Aluminium Windows and Electrical Planning
- Renovation Contracts and Payments in Hong Kong: What to Put in Writing Before You Pay





Open WeChat, Discover, Scan
Or save the QR and import it from your gallery.